Chesterfield County, Virginia
Traffic Simulation Animation
Route 10 Superstreet Animation Provides Project Visualization.
The Challenge:
Provide an accurate traffic simulation animation to display the proposed realignment and associated improved traffic flow to the public.
How We Helped:
Our team collaborated with highway and traffic engineers to ensure all data was spatially accurate, and successfully implemented a new method for integrating the VISSIM traffic model in 3DS Max. Due to the tight turnaround requested by the client, this animation was rendered on an external super-computer known as a "renderfarm", thereby reducing the rendering time from 23 days to 9 hours. This simulation reflects actual proposed roadway geometry imported from MicroStation and InRoads and design-year traffic volumes/movements as analyzed in VISSIM.
Services:
- Video + Photo
- 3D Rendering