Chesterfield County, Virginia

Traffic Simulation Animation

Route 10 Superstreet Animation Provides Project Visualization.

The Challenge:

Provide an accurate traffic simulation animation to display the proposed realignment and associated improved traffic flow to the public.

How We Helped:

Our team collaborated with highway and traffic engineers to ensure all data was spatially accurate, and successfully implemented a new method for integrating the VISSIM traffic model in 3DS Max. Due to the tight turnaround requested by the client, this animation was rendered on an external super-computer known as a "renderfarm", thereby reducing the rendering time from 23 days to 9 hours. This simulation reflects actual proposed roadway geometry imported from MicroStation and InRoads and design-year traffic volumes/movements as analyzed in VISSIM.

Services:

  • Video + Photo
  • 3D Rendering

More Products: